With this new contract, EDPR reinforces its presence in a market with a low risk profile, through the establishment of long term contracts, attractive renewable resources and solid prospects in the medium and long-term.
This new solar project increases EDPR’s portfolio technological diversification on which solar capacity total build-out is expected to reach 1.3 GW by 2022. After this new arrangement, EDPR has now secured 5.3 GW of the 7.0 GW targeted global capacity build-out for the 2019-2022 period, as part of its Strategic update announced on 12 March 2019.




