
Highview Power and Ørsted sign memorandum of understanding
The MoU aims to prove the feasibility and economic value of co-locating long-duration energy storage with offshore wind.
Browse the latest wind news and articles.

The MoU aims to prove the feasibility and economic value of co-locating long-duration energy storage with offshore wind.

Technip Energies, along with three partners – Crowley, Anchor QEA, and Offshore Construction Associates – has been awarded the Floating Offshore Wind Readiness prize for Phase One by U.S. Department of Energy.

TerraSond and Benthic have been awarded a combined geophysical and geotechnical survey work scope by the BlueFloat Energy and Renantis Partnership for its Bellrock and Broadshore wind farms northeast of Aberdeen, Scotland.

Amazon and Mercury NZ have announced a new long-term corporate power purchase agreement for Turitea South, a 103 MW wind farm under construction in New Zealand.

Gazelle Wind Power has teamed up with WAM Horizon to accelerate the development of a pilot plant using Gazelle’s breakthrough floating wind platform, in Aguçadoura, Portugal.

KenzFigee has signed a contract with Aker Solutions for the delivery of an offshore pedestal crane for installation on ScottishPower Renewables HVDC converter station for the East Anglia THREE offshore wind farm in the UK.

The wind turbine is planned to be installed in 2024, and will be the tallest Nabralift tower in Nabrawind’s portfolio.

At the end of March, the Nordex Group signed a contract with E energija group to supply and install wind turbines for a 106 MW wind project in Lithuania.

DNV has launched a JIP alongside wind farm owners, turbine manufacturers, as well as other sector experts, to increase confidence in innovative wind farm control technology.

BayWa r.e. has announced the sale of Dalquhandy wind farm to Greencoat UK Wind PLC, a leading renewable infrastructure fund managed by Schroders Greencoat LLP.

SSE Renewables and Equis have formed a 50/50 owned consortium to bid for a feasibility license to expedite the development, construction, ongoing operations, and ownership of the Gippsland offshore wind farm project.

Vestas has received an order from JUWI GmbH for five wind projects in Germany totalling 63 MW.